Two days later and it’s almost gone. The bridge over the Pemi River is no longer connected to either shore.
At the rate they are going, there will be nothing except pilings left by the end of the week. Hopefully they are as quick at building the new bridge as they have been about tearing down the old one. Then again, the temporary bridge is already better than the old one. I guess we’ve already won.
Thanks Leasa for taking pictures so I could continue driving without getting in a fiery car wreck or driving off the temporary bridge.
For an earlier view of the bridge removal take a look at my post Plymouth Bridge Destruction
Technorati tags: plymouth, plymouth nh, bridge, destruction, plymouth state university, plymouth state college, psu, psc, new hampshire
2 thoughts on “Plymouth Bridge – Almost Gone”